U.S. Geothermal Announces Completion of Well RRG-7 Repair at Raft River Project

U.S. Geothermal HTM announced today that it has successfully completed the repair of production well RRG-7 at the Raft River geothermal power project in southeast Idaho. The repair work was completed by U.S. Geothermal Services Inc., a wholly owned subsidiary, according to plan and budget. Previously well RRG-7 experienced a leak between two overlapping casing strings that allowed cooler geothermal fluid to flow into the well. The repair involved removing the production pump and then completing a "squeeze" job whereby grout was injected into the leaking lap joint. After the squeeze job successfully sealed off the leak, the overhauled production pump was installed and production well RRG-7 was placed back into service on July 2nd. The well is currently producing 1,300 gallons per minute of 297 degrees F fluid. The repair program also includes restoring production at well RRG-2 and those repairs are underway and ongoing.
Market News and Data brought to you by Benzinga APIs
Comments
Loading...
Posted In: NewsUtilities
Benzinga simplifies the market for smarter investing

Trade confidently with insights and alerts from analyst ratings, free reports and breaking news that affects the stocks you care about.

Join Now: Free!