- Capstone Green Energy Corp's CGRN southern U.S. distributor, Lone Star Power Solutions, has contracted with a remote data center in Louisiana to provide a long-term rental of a Capstone C1000S microturbine system. The financial terms of the contract were not disclosed.
- Capstone microturbine rental fleet now stands at 13.1 MW with this contract, aiming to expand to 21.1 MW by March 31, 2022.
- The customer, located on an oil and gas well and handles large volume blockchain and cryptocurrency mining, had approached Lone Star looking for a way to take advantage of their existing on-site production gas. This byproduct would otherwise go to waste.
- The system is expected to be commissioned in October 2021.
- Price Action: CGRN shares are trading higher by 0.72% at $4.18 on the last check Monday.
© 2025 Benzinga.com. Benzinga does not provide investment advice. All rights reserved.
Posted In:
Benzinga simplifies the market for smarter investing
Trade confidently with insights and alerts from analyst ratings, free reports and breaking news that affects the stocks you care about.
Join Now: Free!
Already a member?Sign in