Boston Water And Sewer Commission Picks Stantec For East Boston Sewer Separation Project

  • Stantec Inc. STN STN has been selected to lead design services on Phase IV of the Boston Water and Sewer Commission's (BWSC) East Boston Sewer Separation project.
  • Phase IV of the project involves separating ~230 acres of combined sewer area, installing new storm drains, updating existing sewers, replacing adjacent aging water mains, and modifying existing regulator structures.
  • Stantec team will complete conceptual designs, hydraulic modeling, master planning, and final design documents, including pre-construction services.
  • Stantec has partnered with the BWSC for more than 30 years to complete some of Boston's most complex and demanding sewer separation and infrastructure improvement projects.
  • Most recently, the company completed work on Phase III of the East Boston Sewer Separation project.
  • Price Action: STN shares are trading higher by 0.69% at $43.77 on the last check Tuesday.
Loading...
Loading...
STN Logo
STNStantec Inc
$91.671.93%

Stock Score Locked: Want to See it?

Benzinga Rankings give you vital metrics on any stock – anytime.

Reveal Full Score
Edge Rankings
Momentum
77.92
Growth
73.16
Quality
67.18
Value
24.71
Price Trend
Short
Medium
Long
Market News and Data brought to you by Benzinga APIs

Posted In:
Comments
Loading...